With the relicensing of the hydro project on the Deschutes river new things have been happening. A new revolutionary tower built in front of Pelton dam is now selecting water from different temperature layers of the lake and improving downstream fish migration.
Here is an interesting clip from a PGE biologist on the NEW ERA of upstream migration in the Deschutes basin.
http://www.deschutespassage.com/news/?p=79
No comments:
Post a Comment